如今保溫裝飾一體板隨著建筑節能要求的不斷提高,經歷多次迭代更新。今天小編以某工程外墻保溫施工中所遇到的一些問題進行經驗總結,就高層建筑保溫裝飾一體化板在施工中如何進行質量控制闡述。
Nowadays, with the continuous improvement of building energy conservation requirements, the integrated thermal insulation and decoration board has experienced many iterations and updates. Today, based on the experience of some problems encountered in the construction of external wall insulation of a project, the author expounds how to carry out quality control in the construction of high-rise building insulation and decoration integrated board.
1:施工隊的選用
1: Selection of construction team
工程施工質量的好壞,人的因素往往起到決定性的作用。因為作為產品,目前建筑工程還是是以人為操作為主,所以在施工作業隊伍的選用上要認真進行考察、評比,須要選擇經過外墻保溫一體板專業技術培訓的、有施工經驗的固定的作業隊伍,做到優質優價簽訂合同。
Human factors often play a decisive role in the quality of engineering construction. As a product, the current construction project is still dominated by human operation, so the selection of construction teams should be carefully investigated and evaluated. It is necessary to select a fixed operation team with professional technical training and construction experience of external wall insulation integrated board, so as to sign a contract with high quality and good price.
2:施工作業面的交接
2: Handover of construction working face
對施工完成的工程主體外墻進行認真的復查,做好工序交接準備。復查工作在施工準備工作中非常重要,復查時應對外墻的垂直、平整、抹灰層的空鼓、水平線條的偏差、窗洞口尺寸、預留洞口等都應進行詳細認真的檢查。
Carefully recheck the exterior wall of the main body of the project after construction, and make preparations for process handover. Recheck is very important in construction preparation. During recheck, the verticality and flatness of the external wall, the hollowing of the plastering layer, the deviation of the horizontal line, the size of the window opening, the reserved opening, etc. should be carefully checked.
3:設計方案控制
3: Design scheme control
通常在建筑施工圖紙中外立面設計只是簡單的示意,具體外墻保溫一體板施工須要根據立面圖紙再進行繪制詳細的立面分格圖,在做分格圖設計時,須安排責任心強的專業工人對建筑實體進行分段、分面實際測量,并做好記錄。
Generally, the facade design in the building construction drawings is only a simple sketch. The specific external wall insulation integrated board construction needs to draw a detailed facade grid diagram according to the facade drawing. When doing the grid diagram design, professional workers with a strong sense of responsibility must be arranged to actually measure the building entity in sections and planes, and make records.

4:吊籃(腳手架)的控制
4: Control of basket (scaffold)
外墻保溫裝飾板施工采用吊籃施工時,須達到以下要求:進場吊籃(腳手架)設備在安裝前須要經過現場取樣復檢合格后進行;經有專業資質人員安裝吊籃,吊籃(腳手架)搭設須符合安全規程且經相關部門、單位驗收合格后使用。吊籃腳手架安裝與粘貼墻面距離300-400mm為宜。吊籃內側面須安裝彈性隔離物,以避免吊籃升降時,對已安裝的裝飾板造成損壞。
When hanging baskets are used for the construction of exterior wall thermal insulation decorative panels, the following requirements must be met: the incoming hanging baskets (scaffolds) equipment must pass the on-site sampling and re inspection before installation; The hanging basket (scaffold) shall be installed by professional qualified personnel, and the hanging basket (scaffold) shall be erected in accordance with the safety regulations and be used after being accepted by relevant departments and units. The distance between the installation of basket scaffold and the wall surface should be 300-400mm. Elastic spacers must be installed on the inner side of the basket to avoid damage to the installed decorative panels when the basket is lifted and lowered.
5: Jinan extruded board manufacturer explains other aspects of control
(1)施工時當遇大風、大雨時須停止施工,冬季施工墻體表面溫度不得低于4℃,夏季施工時,墻面板在粘貼后2h以內,應盡量避免陽光曝曬一體板面,必要時搭防曬布,遮擋已完成施工的墻面板。
(1) In case of strong wind and heavy rain during construction, the construction must be stopped. The wall surface temperature during winter construction shall not be lower than 4 ℃. In summer construction, the wall panel shall be protected from sunlight exposure within 2h after pasting. If necessary, sunscreen cloth shall be erected to cover the wall panel that has been completed construction.
(2)在施工保溫裝飾一體化板時,對施工中可能發生碰撞的入口、通道、陽角等部位和可能造成污染的部位,應采取臨時保護措施。等等。
(2) During the construction of insulation and decoration integrated board, temporary protection measures shall be taken for the entrance, passage, external corner and other parts that may collide during the construction and the parts that may cause pollution. wait.
保溫裝飾一體化板作為一種先進的保溫節能裝飾材料,要保證其施工質量除應該做好以上幾個方面控制工作,更有效的保證施工質量。您有需求的話就關注我們網站
http://www.jommz.com聯系我們咨詢相關事項吧。
As an advanced thermal insulation and energy-saving decorative material, in order to ensure its construction quality, we should do a good job in the above aspects to ensure the construction quality more effectively. Follow our website if you need it http://www.jommz.com Contact us for related matters.